One of the most common questions we get on a new build is simply: how long is this going to take? The honest answer is "it depends," but the stages themselves are predictable. Here's the general shape of a project.
Design and permitting
Before anything breaks ground, plans need to be finalized and submitted for approval. Depending on the municipality and scope of work, this stage typically takes the longest to get right — and rushing it tends to cost more time later.
Site work and foundation
Once permits are in hand, crews clear and prep the site, then pour the foundation. This is also when underground utilities get roughed in.
Framing
The structure starts taking shape fast during framing — it's usually the point where a project starts to feel real to homeowners watching it come together.
Mechanical, electrical, and plumbing rough-in
Before walls close up, all the systems that will run through them go in first: wiring, plumbing lines, and HVAC ductwork.
Insulation and drywall
Once rough-ins are inspected and approved, insulation goes in and the walls close up.
Interior finishes
Flooring, trim, cabinetry, paint, and fixtures — this stage is where the design choices made early on really come to life.
Final inspections and walkthrough
Before move-in, the project goes through final inspections, and we walk the finished space with you to make sure everything meets expectations.
Every project has its own variables — lot conditions, material lead times, and scope all shift the timeline. We'll always give you a realistic schedule specific to your project before work begins, not just a generic estimate.